Infrastructure Milestones

NodeX infrastructure deployment journey from scratch to enterprise-grade hosting.

v.5 — June 28, 2025

v.5 — June 28, 2025

All production servers relocated to colocation Home environment removed from the critical path Predictable power, cooling, security, and uptime guarantees achieved

Status: Enterprise infrastructure. Built from zero. Running for real.

v.4 — April 14, 2025

v.4 — April 14, 2025

Migration to a commercial facility with redundant power + fiber Reduced latency and increased overall performance Established standardized deployment and rack procedures

Status: Production infrastructure is now carrier-grade.

v.3 — December 21, 2024

v.3 — December 21, 2024

High-availability cluster configured Automated backups + monitoring introduced Development workloads running on dedicated virtualization layer

Status: From "lab" to "production-grade stack."

v.2 — November 03, 2024

v.2 — November 03, 2024

Lab environment used to test clustering, networking, and storage Multiple iterations of network tuning and rack layout Learned thermal and power requirements through real usage

Status: Architecture proven. Ready to move to controlled environment.

v.1 — October 09, 2024

v.1 — October 09, 2024

Infrastructure built from scratch First bare-metal deployment validated 100% uptime because nothing was running (yet)

Status: Foundation in place. Time to scale.